Brussels, 28/01/2026 (Agence Europe) – Contrary to what we have written previously (see EUROPE 13793/7), Poland already has a building, constructed around ten years ago, to house the headquarters of the future ‘European Customs Authority’ (EUCA). However, in its bid, it is making two other buildings available, in order to leave the choice to the political decision-makers. These are the two buildings that are not yet available. After the work, one will be ready by the end of 2026, and the other by spring 2027 at the latest. Poland wishes to offer the possibility of adapting these structures according to the needs of the EUCA and its personnel. (AD)