A report compiled by the Agency for the Cooperation of Energy Regulators (ACER) and published on Friday 18 December states that Member States still have a long way to go to reach the minimum 70% of integrated transmission capacity that needs to be made available for cross-zonal electricity trading within the EU.
The minimum capacity margin available for cross-zonal trade (MACZT), which has to be met by all transmission system operators (TSOs), was set as part of the Clean Energy for All...