08/09/2021 (Agence Europe) – The last section of the Nord Stream 2 gas pipeline to link Russia to Germany via the Baltic Sea has been welded, its operator Nord Stream 2 AG announced on Monday 6 September. The next step will be to connect the section of the pipeline from the German coast to the section coming from the Danish waters. After that, the pre-commissioning tests can begin, with the aim of bringing the pipeline into operation before the end of this year. On the EU side, the...